NL | EN

Mooring facility and footbridge Rozenburg Lock

Civil waterworks

Mooring facility and footbridge Rozenburg Lock

On the north side of the Rozenburg lock, the Port of Rotterdam Authority has replaced the existing guide structure. This crash barrier serves to protect the TWT Theemsweg railway line from any ships that may have lost their course. For this construction project, we were awarded the prestigious contract to supply, assemble, preserve and pre-assemble the steel structures for the mooring facility and footbridge.

Project details

Client
Deme Group
Location
Rozenburg Lock
Object
Mooring facility and footbridge
Our effort
  • Production of workshop drawings
  • Production of steelwork
  • Preservation
  • Transport
  • Pre-assembly
  • Assembly of walkways after preservation.