On the north side of the Rozenburg lock, the Port of Rotterdam Authority has replaced the existing guide structure. This crash barrier serves to protect the TWT Theemsweg railway line from any ships that may have lost their course. For this construction project, we were awarded the prestigious contract to supply, assemble, preserve and pre-assemble the steel structures for the mooring facility and footbridge.