NL | EN

Closing joint formwork Maasdelta Tunnel – Blankenburgverbinding A24

Civil waterworks

Closing joint formwork Maasdelta Tunnel – Blankenburgverbinding A24

The Blankenburg connection is a new highway (the A24), which from 2024 will connect the A20 near Vlaardingen with the A15 near Rozenburg. The 4.2 km stretch includes a 900-meter-long immersed tube tunnels under the fairway (Maas Delta Tunnel) and a 510-meter-long land tunnel (Holland Tunnel).

For the Maas Delta Tunnel, we supplied the so-called closing joint formwork. These steel elements weigh approximately 147 tons and measure 42,900 x 2,914 x 2,022 mm (L x W x H)

Project details

Client
Baak EPCM V.O.F.
Location
Blankenburgverbinding A24 – Maasdeltatunnel
Object
Closing joint formwork
Our effort
  • Detail engineering
  • Manufacturing
  • Coating
  • Delivery free on site (unassembled)
  • Inspection
  • Fabrication according to EN1090-2
  • Execution class 3