For the construction consortium Levvel EPC V.O.F. we manufactured and installed substantial lengths of handrail systems in various models for the Afsluitdijk project. This was an ongoing contract over a longer period of time, during which many railings were welded and assembled in our factory halls by our certified welders and construction bench workers.
The railing was then transported to the preservation company to have all parts galvanized or coated with zinc and wet paint.
Following this, our field service team installed the railings on the Afsluitdijk under the management and supervision of the construction consortium.